Shanghai ChenFei Machinery Technology Co.,Ltd

Integrity-based, still respecting the virtues, committed to a long time

Manufacturer from China
Active Member
6 Years
Home / Products / Mango Processing Line /

PLC Touch Screen 4T/D Mango Juice Production Line 200KW Power ISO9001

PLC Touch Screen 4T/D Mango Juice Production Line 200KW Power ISO9001

Ask Latest Price
Brand Name :CFM
Model Number :CFM-M-03-04T
Certification :ISO9001
Place of Origin :China (mainland)
MOQ :1/Set
Price :negotiable
Supply Ability :12 sets per year
Delivery Time :150 Work Days
Packaging Details :Plastic film and wooden Case
Material Type :Dried mango production line
Dimension(L*W*H) :According to the machine
Warranty :1 year
End Product :Dried mango
Power :According to the machine
After-sales Service :Engineers can go overseas
Contact Now

Add to Cart

Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
View Product Description

PLC Touch Screen 4T/D Fresh Dried Mango Production / Processing Line

The nutritional value of mango;


Mango is one of the famous tropical fruits. Mango fruit contains sugar, protein and crude fiber. Mango contains a high content of vitamin A, which is rare in all fruits. Secondly, the vitamin C content is not low. Minerals, proteins, fats, sugars, etc. are also the main nutrients. It can be made into juice, jam, canned food, pickled, hot and sour kimchi and mango milk powder, candied fruit, etc. Dried fruit is good for stomach, vomiting, and stun. Therefore, mango is effective for vertigo, Meniere's syndrome, high blood dizziness, nausea and vomiting. The dried mangoes produced by the dried mango production line not only retain the flavor of mango, but also extend the shelf life of mangoes.

Dried mango processing line quality assurance:

1.The motor of Chenfei’s processing machine is basically ABB, Siemens and Jiangsu Dazhong.
2.Stainless steel is from Zhangjiagang Pohang Stainless Steel Co., Ltd. (joint venture)
3.The water pump is from Nanfang and the centrifugal pump is from Yuanan.
4.Electrical cabinet and PLC control system: Siemens PLC touch screen, switch and AC contactor electrical protection is Schneider, intermediate relays are Honeywell.

5.The 304 pipes we use for the pipeline is from Yuan'an, the cables are all good cables.

Dried mango processing line technology advantages:

The preparation method of the dried mango production line processing production line comprises the following steps:
1. Mango as a raw material;
2. Ripening the mango;
3.
Washing the ripened mango;
4. Peeling the mango;
5. Pretreating the peeled mango;
6. The mango after the pretreatment is sliced ​​to obtain a mango slice;
7. The taste of the mango pieces is coded;
8. Color-protecting the mango pieces after the taste is tasted;
9. Drying the mango pieces after the color protection to obtain dried mangoes;
10. Softening the dried mango;
11. Packing the dried mangoes after softening.

Mango dry production line equipment list


Raw materials: around 24 tons / DAY
Requires plant area: 5000
Required power: 200KW
Requires water: 100 tons / day
Boiler: 3T
Need workers: about 100 people
Finished product: 4 tons / DAY
Packing: 40 kg / box (wholesale) and 125g zipper packaging

Production line core equipment parameters:

No Product Name
A: Pre-processing equipment
A1 Meat Cleaver
A2 Hoist
A3 Continuous color protection machine
A4 keg
A5 Vacuum drawing equipment
A6 Hoist + Hopper
A7 Vacuum immersion sugar unit
A8 High speed sugar can
A9 Centrifugal pump
A10 Mesh belt conveyor
A11 Centralized control system
B: Drying equipment
B1 Hot air drying room
B2 Cold air drying room
B3 Drying car
B4 Tray
B5 Nylon mesh
B6 Padding
B7 Paving workbench
B8 Workbench
C:Packaging equipment
C1 Belt conveyo
C2 Z type vibration hoist
C3 10 head combination scale
C4 Stainless steel platform
C5 Bag packaging machine
C6 Conveyor

Flow chart:


Raw fruit -- ripening -- peeling, splitting -- color protection -- vacuum soaking sugar -- drying -- dehumidification -- picking -- packaging

Question and answer:


1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely
4) What about the transportation and delivery date?

W
e use ship to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. We can send the goods by air if there are some emergencies , as long as you afford the freight.

After sale service


1. Welcome to consult us for offer and technical solution.
2. Workshop layout
design is free.
3. Free check raw material quality report to match suit water treatment system.
4. Engineer installation and train client how to use and maintain machine.

The company

PLC Touch Screen 4T/D Mango Juice Production Line 200KW Power ISO9001

China PLC Touch Screen 4T/D Mango Juice Production Line 200KW Power ISO9001 for sale

PLC Touch Screen 4T/D Mango Juice Production Line 200KW Power ISO9001

Inquiry Cart 0